兴土 兴土
Project Introduction
The project starts from Zhongxing of Chongqing Ring Expressway, ends at the provincial boundary near Xiaozhangba, Qijiang District, and connects with the Capacity Expansion Project of Chongxihe-Zunyi Expressway.
  • Client unit
    China Railway 23RD Bureau Group Corporation Limited
  • Project scale
    bridge span 80.245+150.04+79.98m, bridge deck width 16.5m (single box and single room), construction period 2018.8-2020.5
  • Xingtu products
  • Client Evaluation
藻渡河大桥工程详情1600.jpg
share: