Gansu Jinlongyi Road and Bridge Construction (Group) Co., Ltd
Project Introduction
The contract is the section II of Hebei section of Beijing-Xiong'an New District Expressway project. The standard of two-way eight Lane expressway is adopted, with design speed of 120km/h and subgrade width of 42m. The main structures are 41 bridges with a total length of 5865.06m and 56 culverts with a total length of 2464m.