Zaodu River Bridge of Banan-Qijiang Expressway Project
China Railway No.3 Engineering Group CO., Ltd. The Fifth Engineering Co., Ltd.
Project Introduction
The project starts from Zhongxing of Chongqing Ring Expressway, ends at the provincial boundary near Xiaozhangba, Qijiang District, and connects with the Capacity Expansion Project of Chongxihe-Zunyi Expressway.
Client unit
China Railway 23RD Bureau Group Corporation Limited
Project scale
bridge span 80.245+150.04+79.98m, bridge deck width 16.5m (single box and single room), construction period 2018.8-2020.5