Dadao Bridge of Section IX of Pan Borneo Avenue, Malaysia
CCCC-SHEC Sixth Engineering Co., Ltd.
Project Introduction
The total length of Dadao Bridge is 485.35 meters. The superstructure of the main bridge is a continuous rigid frame bridge. The single span of the continuous beam is 150 meters long.
Client unit
Overseas Branch of Zhejiang Communications Construction Group CO., LTD.