Qiupotou (Shaanxi Gansu border) to Xunyi Expressway
Poly Changda Engineering CO., LTD.
Project Introduction
The total length of the project is 24.939km, including 0.619km in Gansu and 24.32km in Shaanxi. It is a two-way four lane expressway with a designed driving speed of 80 km/h and 100 km/h.