Home
Products
Temporary steel bridge
Temporary steel bridge
Steel platform
Steel cofferdam
Steel sheet pile cofferdam
Steel pipe pile cofferdam
Combination of steel sheet pile and steel pipe pile cofferdam
Steel support
XT300 Truss
Tower support type A
Steel pipe and bailey beam support
Disk lock steel tubular scaffold
Preloading block
Unloading block
Traffic steel bridge
Traffic steel bridge
Bridge deck and accessories
Movable suspended scaffolding
Movable suspended scaffolding
Movable suspended scaffolding and formwork
Corbel
Construction safety products
Operation vehicle for bridge crash barrier construction
Stair
Safety barrier
Construction tools
Formwork lifting tool
Prestressed Intelligent Control Tensioning
Concrete Placing-boom
Continuous girder construction
Continuous grider construction
Solution
Design of Construction Schemes
Virtual Construction Simulation
Equipment manufacturing
Steel structure construction
Continuous grider construction
Construction machinery leasing
Projects
Construction Hanging Basket
Bracket at Block 0
Loading bridge
Temporary steel bridge B
Fabricated steel support
Steelpipe pile and assembled truss
Operation Van for Lateral Bridge Crash Barrier Construction
Stairs
R&D
R&D Centre
R&D Team
Patents
About Us
Company
News
Careers
Contact
400-0000-661
CN
Home
Products
Solution
Design of Construction Schemes
Virtual Construction Simulation
Equipment manufacturing
Steel structure construction
Continuous grider construction
Construction machinery leasing
Projects
Construction Hanging Basket
Bracket at Block 0
Loading bridge
Temporary steel bridge B
Fabricated steel support
Steelpipe pile and assembled truss
Operation Van for Lateral Bridge Crash Barrier Construction
Stairs
R&D
R&D Centre
R&D Team
Top equipment
Leading technology
Patents
About Us
Company
News
Careers
Contact
CN
Temporary steel bridge
Temporary steel bridge
Steel platform
Steel cofferdam
Steel sheet pile cofferdam
Steel pipe pile cofferdam
Combination of steel sheet pile and steel pipe pile cofferdam
Steel support
XT300 Truss
Tower support type A
Steel pipe and bailey beam support
Disk lock steel tubular scaffold
Preloading block
Unloading block
Traffic steel bridge
Traffic steel bridge
Bridge deck and accessories
Movable suspended scaffolding
Movable suspended scaffolding
Movable suspended scaffolding and formwork
Corbel
Construction safety products
Operation vehicle for bridge crash barrier construction
Stair
Safety barrier
Construction tools
Formwork lifting tool
Prestressed Intelligent Control Tensioning
Concrete Placing-boom
Continuous girder construction
Design of Construction Schemes
Continuous grider construction
Virtual Construction Simulation
Service Hotline
400-0000-661
Online Services
Corporate WeChat
沪杭高速公路许村段改建工程
中交第一公路勘察设计研究院有限公司
Project Introduction
沪杭高速公路许村段改建工程总投资超30亿元,全长约8.375公里,起点位于沪杭高速公路沈士枢纽以西约1公里处,终点位于现状东湖南路跨线桥东侧,顺接沪杭高速临平段抬升改造工程,形成完整的高架高速公路,采用双向六车道高速公路标准,设计速度120公里/小时。与此同时,高架下的地面道路也将同步新建,取名连杭路,走向与高速走向一致,全线长约9.76公里,采用双向四车道城市主干路标准,设计速度60公里/小时。
Client unit
中交第一公路勘察设计研究院有限公司
Project scale
用钢量2662t,施工周期2020.9-2021.4
Xingtu products
塔式A型支架
安全楼梯
share:
return