Home
Products
Temporary steel bridge
Temporary steel bridge
Steel platform
Steel cofferdam
Steel sheet pile cofferdam
Steel pipe pile cofferdam
Combination of steel sheet pile and steel pipe pile cofferdam
Steel support
XT300 Truss
Tower support type A
Steel pipe and bailey beam support
Disk lock steel tubular scaffold
Preloading block
Unloading block
Traffic steel bridge
Traffic steel bridge
Bridge deck and accessories
Movable suspended scaffolding
Movable suspended scaffolding
Movable suspended scaffolding and formwork
Corbel
Construction safety products
Operation vehicle for bridge crash barrier construction
Stair
Safety barrier
Construction tools
Formwork lifting tool
Prestressed Intelligent Control Tensioning
Concrete Placing-boom
Continuous girder construction
Continuous grider construction
Solution
Design of Construction Schemes
Virtual Construction Simulation
Equipment manufacturing
Steel structure construction
Continuous grider construction
Construction machinery leasing
Projects
Construction Hanging Basket
Bracket at Block 0
Loading bridge
Temporary steel bridge B
Fabricated steel support
Steelpipe pile and assembled truss
Operation Van for Lateral Bridge Crash Barrier Construction
Stairs
R&D
R&D Centre
R&D Team
Patents
About Us
Company
News
Careers
Contact
400-0000-661
CN
Home
Products
Solution
Design of Construction Schemes
Virtual Construction Simulation
Equipment manufacturing
Steel structure construction
Continuous grider construction
Construction machinery leasing
Projects
Construction Hanging Basket
Bracket at Block 0
Loading bridge
Temporary steel bridge B
Fabricated steel support
Steelpipe pile and assembled truss
Operation Van for Lateral Bridge Crash Barrier Construction
Stairs
R&D
R&D Centre
R&D Team
Top equipment
Leading technology
Patents
About Us
Company
News
Careers
Contact
CN
Temporary steel bridge
Temporary steel bridge
Steel platform
Steel cofferdam
Steel sheet pile cofferdam
Steel pipe pile cofferdam
Combination of steel sheet pile and steel pipe pile cofferdam
Steel support
XT300 Truss
Tower support type A
Steel pipe and bailey beam support
Disk lock steel tubular scaffold
Preloading block
Unloading block
Traffic steel bridge
Traffic steel bridge
Bridge deck and accessories
Movable suspended scaffolding
Movable suspended scaffolding
Movable suspended scaffolding and formwork
Corbel
Construction safety products
Operation vehicle for bridge crash barrier construction
Stair
Safety barrier
Construction tools
Formwork lifting tool
Prestressed Intelligent Control Tensioning
Concrete Placing-boom
Continuous girder construction
Design of Construction Schemes
Continuous grider construction
Virtual Construction Simulation
Service Hotline
400-0000-661
Online Services
Corporate WeChat
都昌至九江高速公路(都昌至星子段)C5合同段鄱阳湖特大桥
中交路桥华南工程有限公司
Project Introduction
鄱阳湖特大桥是都九二期(都昌至星子段)关键性控制工程。项目位于九江市都昌和星子县境内,横跨有“东方百慕大”之称的国内第一大淡水湖鄱阳湖老爷庙水域。项目主桥全长5589m,桥面宽度为24.5m至28m,主桥系用双塔五跨双索面组合梁斜拉桥方案。大桥双向四车道,设计速度100km/s沥青混泥土路面,汽车荷载为公路I级,洪水频率1/300。
Client unit
中交路桥华南工程有限公司