Demonstration animation of Hangzhou-Shaoxing Intercity Railway over Hangzhou-Ningbo Railway and Testing Line Project
China Railway No.3 Engineering Group The Second Engineering Co., Ltd.
Project Introduction
Hangzhou-Shaoxing Intercity Railway starts from Niangqiao Station in Xiaoshan District of Hangzhou and ends at Diyang Road Station in Keqiao District of Shaoxing. There are 10 stations in the whole line, with a total length of 20.3km. It is planned to be put into trial operation at the end of 2020.
Client unit
China Railway 24th Bureau Group Corporation Limited
Project scale
The 1293m long bridge project from pier 01 to pier 34 of the double track bridge between Qianqing Station and Keqiao West Station in the railway section. The single track bridge pier 01 to pier 60 of the testing line is a 1740m long bridge project. The total length of the two sections is 3033m.