Dadao Bridge of Section IX of Pan Borneo Avenue, Malaysia
China Railway No.3 Engineering Group The Second Engineering Co., Ltd.
Project Introduction
The total length of Dadao Bridge is 485.35 meters. The superstructure of the main bridge is a continuous rigid frame bridge. The single span of the continuous beam is 150 meters long.
Client unit
Overseas Branch of Zhejiang Communications Construction Group CO., LTD.