The Panama Fourth Bridge was started on December 4, 2018. The bridge is designed as a steel cable-stayed bridge with double towers and double cable planes. The main bridge is 1010 meters long and the bridge deck is 51 meters wide, of which the main span across the canal is 510 meters long and the clearance is 75 meters. There are approach bridges and 8 Interchanges on both East and West sides.
-
Client unit
CCCC-SHEC First Engineering Co., Ltd.
-
Project scale
1 main trestle and 36 supporting trestles, total weight 2081 tons
-
Xingtu products