兴土 兴土
Project Introduction
The total length of Jiaxing Urban Expressway Loop project is 28.67 km, which is composed of Central West Road-Central Ring North Road-Third Ring East Road-Changshui Road. The main line of the project adopts the standard of urban expressway, the design speed is 80 km/h, the scale of two-way 6-lane (partial section two-way 8-lane).
  • Client unit
    China Railway 12th Bureau Group CO., LTD.
  • Xingtu products


share: