No.4 Work Area of Section I of Huzhou-Hangzhou Railway
Shandong HangHui Construction Services Co., Ltd
Project Introduction
Huzhou-Hangzhou High Speed Railway leads from Huzhou station and connects with Tonglu station of Hangzhou-Huangshan High Speed Railway. It is a double track high-speed railway with a design speed of 350km/h, a main line length of 128.992 km and a tie line of 6.796 km.
Client unit
China Railway Major Bridge Engineering Group No.2 Enginenering CO., LTD.