兴土 兴土
Project Introduction
The reconstruction project of Xucun section of Shanghai-Hangzhou Expressway has a total investment of more than 3 billion yuan, with a total length of about 8.375km. The starting point is about 1km to the west of Shenshi Hub of Shanghai-Hangzhou Expressway, and the terminal point is located at the east side of the overpass bridge of the existing Donghu South Road. It is connected with the lifting and reconstruction project of Linping section of Shanghai-Hangzhou Expressway, forming a complete elevated expressway. The standard of two-way six lane expressway is adopted and the design speed is 120km/h. At the same time, the ground road under the viaduct will also be built at the same time, named Lianhang Road, with the same trend as the expressway. The whole line is about 9.76km long. The standard of two-way four lane urban trunk road is adopted, and the design speed is 60km/h.

QQ图片20201225131559_副本.jpg微信图片_20201226102802_副本.jpg

share: