Section XIII of Jinhua Rail Transit Jinyidong Line
The 4th Engineering CO., LTD. of CCCC 1st Highway Engineering CO., LTD.
Project Introduction
Jinyidong Line has a total length of 107.17 kilometers, consisting of Jinyi section and Yidong section. The two sections intersect in a T-shape at Qintang Terminal.