兴土 兴土
Project Introduction
Jintan Yellow River Bridge in Jingyuan County is located in the east of the county seat, starting at the intersection of Binhe South Road and East Second Ring Road Branch in the east of Jingyuan County seat, crossing the Yellow River northward, and ending at Misan Highway on the north bank of the Yellow River. The total estimated investment of the project is 405 million yuan, with a total length of 1.089 kilometers, including the Yellow River Bridge of 813 meters, the width of the main bridge of 36.5 meters, two-way six lane, and the width of the auxiliary road subgrade of 13.5 meters. The design speed of the main road is 60km/h, and the design speed of the auxiliary road is 30km/h.

share: