The project starts from Xiangshandai Port, connects the current Xiangshan Port Bridge and Connection Line, ends at Liuao, Sanmen County, Taizhou, and connects the Taizhou Bay Bridge and Connection Project under construction, with a total length of about 55 km.
-
Client unit
CCCC Second Harbor Engineering Company Ltd.
-
Project scale
total length 4300 meters, total area 34400 square meters, steel consumption 21000 tons, construction period 2015.5-2015.7
-
Xingtu products