The total length of the line is 15.184km, 12 stations are set, including 6 transfer stations, all of which are underground lines.
-
Client unit
CCCC Tunnel Engineering Company Limited
-
Project scale
total length 18 meters, total area 768 square meters, steel consumption 560 tons, construction period 7 days
-
Xingtu products