Project Introduction
The total length of the line is 15.184km, 12 stations are set, including 6 transfer stations, all of which are underground lines.
  • Client unit
    CCCC Tunnel Engineering Company Limited
  • Project scale
    total length 18 meters, total area 768 square meters, steel consumption 560 tons, construction period 7 days
  • Xingtu products

杭州地铁10号线一期工程_副本.jpg