Home
Products
Temporary steel bridge
Temporary steel bridge
Steel platform
Steel cofferdam
Steel sheet pile cofferdam
Steel pipe pile cofferdam
Combination of steel sheet pile and steel pipe pile cofferdam
Steel support
XT300 Truss
Tower support type A
Steel pipe and bailey beam support
Disk lock steel tubular scaffold
Preloading block
Unloading block
Traffic steel bridge
Traffic steel bridge
Bridge deck and accessories
Movable suspended scaffolding
Movable suspended scaffolding
Movable suspended scaffolding and formwork
Corbel
Construction safety products
Operation vehicle for bridge crash barrier construction
Stair
Safety barrier
Construction tools
Formwork lifting tool
Prestressed Intelligent Control Tensioning
Concrete Placing-boom
Continuous girder construction
Continuous grider construction
Solution
Design of Construction Schemes
Virtual Construction Simulation
Equipment manufacturing
Steel structure construction
Continuous grider construction
Construction machinery leasing
Projects
Construction Hanging Basket
Bracket at Block 0
Loading bridge
Temporary steel bridge B
Fabricated steel support
Steelpipe pile and assembled truss
Operation Van for Lateral Bridge Crash Barrier Construction
Stairs
R&D
R&D Centre
R&D Team
Patents
About Us
Company
News
Careers
Contact
400-0000-661
CN
Home
Products
Solution
Design of Construction Schemes
Virtual Construction Simulation
Equipment manufacturing
Steel structure construction
Continuous grider construction
Construction machinery leasing
Projects
Construction Hanging Basket
Bracket at Block 0
Loading bridge
Temporary steel bridge B
Fabricated steel support
Steelpipe pile and assembled truss
Operation Van for Lateral Bridge Crash Barrier Construction
Stairs
R&D
R&D Centre
R&D Team
Top equipment
Leading technology
Patents
About Us
Company
News
Careers
Contact
CN
Temporary steel bridge
Temporary steel bridge
Steel platform
Steel cofferdam
Steel sheet pile cofferdam
Steel pipe pile cofferdam
Combination of steel sheet pile and steel pipe pile cofferdam
Steel support
XT300 Truss
Tower support type A
Steel pipe and bailey beam support
Disk lock steel tubular scaffold
Preloading block
Unloading block
Traffic steel bridge
Traffic steel bridge
Bridge deck and accessories
Movable suspended scaffolding
Movable suspended scaffolding
Movable suspended scaffolding and formwork
Corbel
Construction safety products
Operation vehicle for bridge crash barrier construction
Stair
Safety barrier
Construction tools
Formwork lifting tool
Prestressed Intelligent Control Tensioning
Concrete Placing-boom
Continuous girder construction
Design of Construction Schemes
Continuous grider construction
Virtual Construction Simulation
Service Hotline
400-0000-661
Online Services
Corporate WeChat
SG03 of Phase II of Chongxian to Donghu Connecting Line Project
CCCC Tunnel Engineering Company Limited
Project Introduction
The phase II of Chongxian to Donghu Connecting Line Project adopts the double-layer combination of viaduct and ground road.
Client unit
Haigang Road & Bridge Co., Ltd
Xingtu products
Traffic steel bridge
share:
Previous:Prefabrication Yard of Ningbo Zhoushan Port Main Channel Project
Next:Phase I of Hangzhou Metro Line 10 Project
return