The project starts from Xiatang Station, Chengdong Street, Leqing City, and ends at Renmin Road Station in Ruian City. The total length of the line is 63.63km. It is a key channel for rapid connection of coastal industrial development belt in the core area of Wenzhou metropolis in the future.