兴土 兴土
Project Introduction
The project starts from the intersection of the existing CaiTian Road and Lianhua Branch Road in the south, crosses Beihuan Avenue in the north, continues to cross Meilin Road, connects the existing CaiTian Road in the north, and ends at Meidong Second Road. The total length of the road is about 1.4km.
  • Client unit
    Shenzhen Construction CO., LTD. of CCCC First Highway Engineering Group CO., LTD.
share: