G228 Lubu Interconnection and S319 Zhangting Interconnection Construction Project
China Railway No.3 Engineering Group CO., Ltd. The Fifth Engineering Co., Ltd.
Project Introduction
The G228 Lubu Interchange and S319 Zhangting Interchange Construction Project starts at 340m north of Cixi junction, connects Shengshan-Lubu Highway (Henghe-Yuci boundary section) in the north, and connects Hangzhou-Ningbo Expressway Lubu Interchange in the south. The total length of the route is about 9.218km. The main line adopts the standard of two-way 6-lane first-class highway, and the design speed is 80km/h.
Client unit
Shaanxi Zhonghongyu Construction Engineering Co., Ltd