Project Introduction
The mainline viaduct of Reconstruction and Expansion Project of Suzhou East Section of National Highway 312 crosses the Beijing-Shanghai Railway and Shanghai-Nanjing Intercity Railway, and the rigid frame bridge with pile slab structure undercrossing the Beijing-Shanghai High-Speed Railway, both of which are railway related construction. Ensuring the operation safety of the line is the top priority of the project.
  • Client unit
    China Railway 24th Bureau Group Corporation Limited
  • Project scale
    Kunshan section of Reconstruction and Expansion Project of Suzhou East Section of National Highway 312 has a total length of 2.836km and a standard bridge width of 31m.